- Print
- DarkLight
- PDF
Generating cash accountability does not create cash accountability, how is that possible?
The date specified in the generation screen is valid until yesterday.
If a user still wants to create an accounting on the same day, the task scheduler cannot assist with that. The interval setting must be changed to 'Batch'. This will generate all accountings up to the specified end date or the system date in the task scheduler. It is technically possible to create multiple accountings for the same day if generating multiple times on the same day.
There is also a second setting called 'Automatically generate accountings'. If this is active, the accountings are created through the task scheduler. By turning off this setting, a task schedule can still exist, but it will not be executed. The reason for this setting is to allow for one task schedule and make exceptions for certain locations.